Last edited by Togami
Wednesday, July 22, 2020 | History

1 edition of Proposed expansion of mining and reclamation plan, Big Sky Mine found in the catalog.

Proposed expansion of mining and reclamation plan, Big Sky Mine

Geological Survey (U.S.)

Proposed expansion of mining and reclamation plan, Big Sky Mine

Peabody Coal Company, Rosebud County, Montana, Federal lease M-15965 : final environmental statement

by Geological Survey (U.S.)

  • 176 Want to read
  • 24 Currently reading

Published by The Survey in Reston, Va.] .
Written in English

    Subjects:
  • Strip mining,
  • Coal mines and mining,
  • Reclamation of land

  • Edition Notes

    Other titlesBig Sky Mine expansion.
    Statementprepared by U.S. Geological Survey, Department of the Interior [and] Montana Department of State Lands
    ContributionsMontana. Department of State Lands
    The Physical Object
    Pagination130 p. in various pagings :
    Number of Pages130
    ID Numbers
    Open LibraryOL25599387M
    OCLC/WorldCa6017562

      According to the proposed expansion, about six acres of ground would be disturbed each year over the eight-year life of the mine. The mine began operating in . Mining and reclamation plan, Asarco-mission complex, Gault group inc, Arizona, Railroad Commission of Texas: Texas Abandoned Mine Land Reclamation Projects, Surface Mining and Reclamation.

    The Amigos Bravos Full Reclamation and Closure Plan for the Molycorp molybdenum mine in Questa, New Mexico, has been developed to meet the requirements of the New Mexico Water Quality Act, the New Mexico Mining Act and other relevant state and federal Size: 3MB.   Detailed baseline inventories, reclamation plan and comprehensive OSM application review for coal mine and railroad corridor: Youngs Creek Mine, Big Horn County, Montana and Sheridan County, Wyoming: Detailed baseline inventories and reclamation plan for coal mine: Pearl Project, Big Horn County, Montana: Signal Peak Energy.

    MINING AND RECLAMATION PLAN BLACK MESA AND KAYENTA MINES INDEX Chapter Title Volume Appendix A Appendix A-1 Appendix B Appendix C Appendix D Appendix E Signs, Markers, Maps, Plans, and Cross Sections 11A Surface Stabilization Plan 2 8 Soils Resources of the Black Mesa Lease Area Soil Survey Report Life of Mine Coal Resource AreasFile Size: KB. Nova Scotia Environment, Guide for Surface Coal Mine Reclamation Plans PLANNING FOR RECLAMATION: A clear objective for reclamati on and final land use shoul d be defined b y mine proponent s and/or the land owner. T aking the tim e to plan the various asp ects of reclamation early in a project will be of benefit.


Share this book
You might also like
report on multi-media learning

report on multi-media learning

Outline of orthopaedics

Outline of orthopaedics

A walk round the city

A walk round the city

Culture and strains of the stinking smut of wheat.

Culture and strains of the stinking smut of wheat.

Impressionist prints.

Impressionist prints.

Holborn

Holborn

The use of economic projections in long-range business planning

The use of economic projections in long-range business planning

Performance of trickling filter plants

Performance of trickling filter plants

Eight years of peoples war in Oman.

Eight years of peoples war in Oman.

Geochemical and biogeochemical reaction modeling

Geochemical and biogeochemical reaction modeling

Television and young people.

Television and young people.

Touching the harpstrings

Touching the harpstrings

Priorities for action 2004/2005

Priorities for action 2004/2005

When No 1 Was Lookg

When No 1 Was Lookg

Proposed expansion of mining and reclamation plan, Big Sky Mine by Geological Survey (U.S.) Download PDF EPUB FB2

Proposed expansion of mining and reclamation plan, Big Sky Mine: Peabody Coal Company, Rosebud County, Montana, Federal lease M final environmental statement by Geological Survey (U.S.); Montana.

Department of State LandsPages: environmental review of Peabody Coal Company's proposed mining and reclamation plan and has recommended to the Department approval of the plan contingent on the applicant's acceptance of stipulations. The notice of availability of the mining and reclamation plan for the Big Sky mine was published in the Federal Register on November 8,44 FR [Page ].

Full Extent of Mine Disturbance (76 acres) Bureau of Land Management Proposed Mining and Reclamation Plan of Operations Map Prepared by Brian L. Buttazoni on June 7, 0 Miles Iron Springs Road. specific requirements that may arise while the mine reclamation plan is being drafted. (Please refer to Appendix B when searching for sources of existing information available to the Proposed expansion of mining and reclamation plan.

* In order to develop a mine reclamation plan an applicant must first decide upon and propose a target post-mining land use or Size: KB. The proposed expansion of mine is from to million TPA of Lead-Zinc Ore Production & Lead-Zinc ore Beneficiation from to million TPA.

The additional cost of this expansion project is around Rs. Crores. The Proposed expansion site falls in Tehsil Relmagra of district Rajsamand in Rajasthan State. The Mining LeaseFile Size: KB. Mining activities are proposed to be continuous and completed approximately 40 weeks after the start of construction of the wind project.

During the mining period, approximatelytocubic yards of raw materials will be extracted. The project consists of mining sand and gravel from the banks and channel of the Detrital Wash.

Econ, Inc. Wildlife monitoring report, field season, Big Sky Mine. March In Peabody Mining and Reclamation Plan Big Sky Mine Area B. Vol. 8, cont., Tab 10 - Wildlife Resources.

AppendixAnnual Wildlife Report. This document provides a conceptual closure and reclamation plan for the proposed Casino Project to support the environmental assessment process.

This plan will be expanded during the Quartz Mining License application to meet additional reporting requirements, such as costing, as detailed in the Yukon Mine Reclamation and Closure Policy. (b) Transport from Mine head to destination 10 Conceptual Mining plan 10 Post Mining Reclamation Plan including afforestation.

10 Raw material required along with estimated quantity, likely source, marketing area of final products, Mode of. The Surface Mining Control and Reclamation Act of (SMCRA) provides that, as a prerequisite for obtaining a coal mining permit, an applicant must post a reclamation bond to ensure that the regulatory authority has sufficient funds to reclaim the site in the case the permittee fails to complete the approved reclamation plan.

Under SMCRA (c) there are several avenues for coal mining. Department of the Interior. Bureau. L nd. Management.

Solid Mine Is eclamation Handbook) noncoalleasable minerals, locatable minerals, salable minerals. BlM. Manual. Handbook H Final environmental impact statement on the proposed mining and reclamation plan for Westmoreland Resources, inc.

Absaloka Mine, Big Horn County, Montana Item Preview remove-circle Share or Pages: Econ, Inc. Wildlife monitoring report, field season, Big Sky Mine. March In Peabody Mining and Reclamation Plan Big Sky Mine Area B. Vol. 8, cont., Tab 10 - Wildlife Resources. for a Hard Rock Operating Permit and Proposed Plan of Operation, Montanore Project, Lincoln and Sanders Counties, Montana.

12, 13 T1N R40E. Proposed expansion of mining and reclamation plan, Big Sky Mine by Geological Survey (U.S.) 1 edition - first published in Read Listen. Sample Reclamation Plan. Reclamation Plan of River Ranch Operation Hanson Aggregates Arizona, INC. Arizona State Mine Inspector. West Washington, 4th Floor.

Phoenix, AZ Find in Google Maps Phone: Fax: HELENA — The state Supreme Court has rejected an environmental group's challenge to the reclamation plan for the proposed expansion of an open-pit gold mine near Whitehall. State and Federal actions involve either approval or denial of permits for the reclamation plans, Big Sky mine, Peabody Coal Co., Rosebud County, Montana.

The company proposes to expand the existing plant and loading facilities, haul and access roads, and the existing rail spur extending from Colstrip would be utilized. to prepare the mining plan and that provisions of all relevant rules and regulations have been considered while preparing the mining plan.

(vi) Certificate from empowered representative of/or Block Allottee/Applicant that the mine will be developed as per the approval of the Mining Plan from Ministry of Coal and all OtherFile Size: KB. MINING AND RECLAMATION PLAN. KAYENTA MINE. INDEX OF DRAWINGS, PLANS, AND CROSS SECTIONS.

Drawing. Number Title Volume _____ Land Use Map Black Mesa Leases, Right-of-Ways, and. Permit Area Anasazi Sites with Mining Areas Historic Sites with Mining Areas Proposed Plan of Mining & Reclamation Big Sky Mine, Peabody Coal Co. Coal Lease M, Colstrip, Montana, Oct.

25,US Department of the Interior: Draft v.1, v.2; Final v.3 Environmental Impact Statement: Proposed Plan of Mining and Reclamation, Troy Project - ASARCO, Lincoln County, Montana, US Department of Agriculture.

Spring Creek flows northeast from Rosebud Mine Area D. The proposed mining with AM4 is located away from Area D and will not affect the water quality in Spring Creek drainage.

Lee Coulee is an ephemeral to intermittent stream that flows through Big Sky Mine Area B into Rosebud Creek. The proposed expansion of mining.“I wouldn’t want a coal mine in my backyard,” said Jeffrey Fleischman, with the Office of Surface Mining Reclamation and Enforcement, a division of the U.S.

Department of the Interior. “But our job is to make sure the environment is protected and the land is reclaimed to the same or higher standard that it was before it was mined.”.2 April Skyline Mine Flat Canyon Coal Lease Tract Mining Plan Modification Introduction The Office of Surface Mining and Reclamation Enforcement (OSMRE) has completed the environmental review of the Skyline Mine Flat Canyon Coal Lease Tract Mining Plan Modification proposal under the National Environmental Policy Act (NEPA).